<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
    <channel>
        <title>Hillstone Products Load Bank RSS feed</title>
        <description>Hillstone manufacture and hire AC &amp; DC load banks which are used for testing generators and UPS Systems, Batteries and Fuel Cells.&lt;br /&gt;&lt;br /&gt;
Hillstone also has a range of portable battery chargers for lead acid &amp; Ni-Cad batteries
&lt;br /&gt;
The contents of this RSS feed will change to update new designs, available stock, new hire fleet equipment and news from this specialist UK supplier.</description>
        <link>http://www.hillstone.co.uk/index.htm</link>
        <copyright>Hillstone Products Limited</copyright>
        <language>Copyright 2007</language>
        <lastBuildDate>Sun, 13 Feb 2011 06:54:16 +0000</lastBuildDate>
        <managingEditor>paul@hillstone.co.uk (Paul Smethurst)</managingEditor>
        <pubDate>Sun, 13 Feb 2011 06:42:11 +0000</pubDate>
        <generator>FeedForAll Mac v2.1 (2.1.0.1); http://www.FeedForAll.com/</generator>
        <item>
            <title>Data Centre Load bank press release</title>
            <description>Electrical Review online advirtising article previews 19&quot; load banks for IST testing in datacenters</description>
            <link>http://bit.ly/fF2nwM</link>
            <guid isPermaLink="false">680063F1-83B4-4E35-9AF7-516DC18F99AC-53138-0002B28B0FE5DE7E-FFA</guid>
            <pubDate>Sun, 13 Feb 2011 06:47:23 +0000</pubDate>
        </item>

        <item>
            <title>Load bank press release blog- Middle East Power magazine show addition for Dubai Middle East Electricity Exhibition</title>
            <description>The press release of the load bank article in Middle East Power magazine is blogged online.  &lt;P&gt; The article covers recent works on the new Dubai Metro and commissioning of generators in Qatar.</description>
            <link>http://bit.ly/gNbxdy</link>
            <guid isPermaLink="false">EF68125B-E793-4B96-ABD0-B6BE557E3436-53138-0002B14AF45CF0AA-FFA</guid>
            <pubDate>Sun, 13 Feb 2011 06:48:23 +0000</pubDate>
        </item>

        <item>
            <title>NEW 6KW - 19&quot; rack mounted load banks are designed for data hall thermal HVAC testing</title>
            <description>The latest addition to the range of Hillstone load banks now includes a new concept in DataCenter load testing.  &lt;br /&gt;
&lt;br /&gt;&lt;br /&gt;

The NEW  6KW - 4U  rack mounted load banks can be selected to give from 1.1Kw to 6.6KW.  &lt;br /&gt;  The 6KW module are designed to be connected with cables to C19 or C32 cable plugs.
&lt;br /&gt;
In addition the NEW Hillstone mini tower can house 3 - 6KW modules to give upto 20KW of 3 phase or single phase loads.  The  free standing mini towers option allows for HVAC thermal load testing for data halls that has not been fitted out with server racks.  &lt;br /&gt;
&lt;br /&gt;
The online datasheet details the 6KW loads and mini towers.</description>
            <link>http://www.hillstone.co.uk/HAC230-6RM.pdf</link>
            <guid isPermaLink="false">9FECAEA7-21F6-4F7D-9622-7DB76C2039F2-10198-0000AF3A83C4896F-FFA</guid>
            <pubDate>Mon, 10 Jan 2011 22:00:27 +0000</pubDate>
        </item>

        <item>
            <title>Updated directions to UK offices</title>
            <description>For online directions to Hillstone offices in Bury, Lancashire the new directions now include a link to an interactive Google Map of our facility</description>
            <link>http://www.hillstone.co.uk/hillstonedir.pdf</link>
            <guid isPermaLink="false">2A188051-C420-4A54-B6E1-453FE81A0026-10198-0000AF0BF150AB14-FFA</guid>
            <pubDate>Mon, 10 Jan 2011 22:00:42 +0000</pubDate>
        </item>

        <item>
            <title>ADIPEC 2010 - Abu Dhabi 1st to 4th Novemeber 2010</title>
            <description><![CDATA[ADIPEC - ABU DHABI INTERNATIONAL PETROLEUM EXHIBITION & CONFERENCE is one of the worlds major Oil & Gas shows which is held at the ABU DHABI NATIONAL EXHIBITION CENTRE - UAE between 1st to 4th November 2010.<br />

 <br />
It is our great pleasure to once again exhibit along side our Middle East partners - Gulf Incon International and showcase both AC and DC load banks in Hall # 4, Booth # 04064 <br> <br />
Our show profile is available <a href="http://bit.ly/aBjY4r">online</a> 
<br />
<br />
We hope to once again meet with new and existing customers that require load banks for testing Generators, UPS Systems, Batteries, Fuel Cells & HVAC.  <br /><br />
Our Sales Team will be available to advise on both rental and sales requirements<br />
<br />

For customer that cannot attend this week our literature is also available for pre-show release <a href="http://bit.ly/aLeX5q">download</a><br />
]]></description>
            <link>http://bit.ly/byQG5i</link>
            <guid isPermaLink="false">AE10C6EA-83B5-4B5F-92BF-8B58AA84A3F7-14937-00008A9A21F66FEF-FFA</guid>
            <pubDate>Sun, 31 Oct 2010 10:52:27 +0000</pubDate>
        </item>

        <item>
            <title>IPEE 2010 - NEC UK - 8th to 10th June 2010</title>
            <description><![CDATA[IPEE 2010 - NEC UK - 8th to 10th June 2010 <br />
Hillstone Products will be exhibiting at the International Power & Energy Europe show; stand A3 HAll 2 at the NEC Birmingham England.  As part of the shows sponsorship package every visitors entry badge will have the Hillstone logo<br />
<br />
On our stand we will be showcasing a variety of load bank range that includes 4KW 19” rack mounted load banks in a power cabinet, a 100KW AC 3 phase load bank, and our new AC 800KW load bank.<br />
<br />
In addition we will be releasing our new literature that cover our extensive range of AC & DC load banks available for sale or rental in the UK & Middle East and our new battery monitoring system.<br />
<br />
The new literature is also available for pre-show release <a href="http://bit.ly/aLeX5q">download</a><br />
<br />
We will be delighted to meet all visitors next week.

 ]]></description>
            <link>http://www.ipee.co.uk/</link>
            <guid isPermaLink="false">93E06FF6-64A3-4121-853D-A78E84373EFD-3803-000027E0E2775ED0-FFA</guid>
            <pubDate>Sat, 05 Jun 2010 16:25:34 +0100</pubDate>
        </item>

        <item>
            <title>Hillstone Apple online photo album</title>
            <description>A selection of different load banks that we have supplied over the past 10+ years have been cataloged onto the Apple online gallery.  &lt;P&gt;The album shows AC outdoor load banks and DC battery testing system.&lt;p&gt;&lt;br /&gt;
</description>
            <link>http://gallery.me.com/hillstone1</link>
            <guid isPermaLink="false">0D086A8A-99AD-4E40-BD75-4796C12BBAF0-29232-00009D0A5303BA40-FFA</guid>
            <pubDate>Tue, 23 Jun 2009 21:50:37 +0100</pubDate>
        </item>

        <item>
            <title>Hire fleet expansion news story published by the Electrical Review</title>
            <description>Hillstone Products load bank hire fleet has received significant investment over the past 12   months with the introduction of new AC load banks and additional DC equipment. The subsequent expansion for generator &amp; UPS testing has coincided with expansion across the UK hire fleet and the establishment of our&lt;br /&gt;
&lt;br /&gt;
</description>
            <link>http://www.electricalreview.co.uk/news/118371/Hillstone_banks_on_expansion.html</link>
            <guid isPermaLink="false">4C25A669-811B-4683-852D-59D320C0F749-29068-00009C18D23A6F77-FFA</guid>
            <pubDate>Tue, 23 Jun 2009 21:01:59 +0100</pubDate>
        </item>

        <item>
            <title>Hillstone twittering on Twitter</title>
            <description>Hillstone have started a Twitter feed which will allow interested customers to follow the latest news on the popular new utility messaging web server.&lt;br /&gt;

&lt;br /&gt;

 We welcome new followers......</description>
            <link>http://twitter.com/paulsmethurst</link>
            <guid isPermaLink="false">6753E486-551B-47B6-8C4B-70F3E03B8499-28841-00009B528CE6B885-FFA</guid>
            <pubDate>Tue, 23 Jun 2009 20:41:21 +0100</pubDate>
        </item>

        <item>
            <title>Series 2 - Varicon Load Bank released</title>
            <description>During 2009 Hillstone have released the second series of Varicon load banks. &lt;br&gt;&lt;br&gt;
The series 2 is available with an expanded product range which now includes 60V units and an additional 130V model.&lt;br&gt;
&lt;br &gt;The Varicon load banks which can now be offered with a remote hand held controller and the Hillstone PC data logging software providing a cost effective and reliable solution for battery discharge testing.&lt;br&gt;&lt;br&gt;
The full range of datasheets are available for download on the Hillstone web site.</description>
            <link>http://www.loadbanks.co.uk/dc.htm</link>
            <guid isPermaLink="false">FEB99F76-3D03-42A5-9D9B-E7AB3B156E04-17308-0000976C13A08B00-FFA</guid>
            <pubDate>Thu, 04 Jun 2009 00:15:40 +0100</pubDate>
        </item>

        <item>
            <title>Portable Battery Chargers</title>
            <description>The Hillstone web site has now been updated with details of the range of available portable battery chargers.  &lt;br&gt;&lt;br&gt;&lt;br /&gt;
The range covers from 3 x lead cell or 5 Ni-Cad batteries up to 66 lead acid 105 Ni-Cad systems&lt;br&gt;&lt;br /&gt;
&lt;br /&gt;
The light weight and robust design makes these chargers ideal for off shore and industrial environments </description>
            <link>http://www.hillstone.co.uk/chargers.html</link>
            <guid isPermaLink="false">6AD7D70A-E6D0-4E27-A014-00E074A82DFA-65912-0001C7B35DDDF133-FFA</guid>
            <pubDate>Thu, 30 Apr 2009 09:15:55 +0100</pubDate>
        </item>

        <item>
            <title>Online load bank photo album</title>
            <description>A selection of different load banks that we have supplied over the past 10+ years have been cataloged onto the web using Flickr.  &lt;P&gt;The album shows AC outdoor load banks and DC battery testing system.</description>
            <link>http://www.flickr.com/photos/36092250@N08/</link>
            <guid isPermaLink="false">38C19FDA-25F3-4BCB-B6E8-203F05B37CB3-60233-00019019C7EC229B-FFA</guid>
            <pubDate>Tue, 28 Apr 2009 17:01:33 +0100</pubDate>
        </item>

        <item>
            <title>STOCK load banks - April / May 2009</title>
            <description><![CDATA[Due to high demands for our load banks available stock levels are reduced.  These will be replenished over the coming weeks but please contact our sales team with your requirements.<br><br />
Tel +44(0) 161 763 3100<br><br>

*************************************************************<br />
<u>Typical production timescales are being offered from </u> <br />
		                    4 to 6 weeks<br />
*************************************************************<br />
<br />
<div><div>These load banks can be shipped to any worldwide destination, please email your local airport to our <a href="mailto:loadbanks@mac.com">sales </a>department</div></div><br />
</div>
<br />
Our hire fleet carries a wide range of AC & DC load banks for immediate testing requirements.
]]></description>
            <link>http://www.hillstone.co.uk</link>
            <guid isPermaLink="false">F5D54C87-14EB-420A-B421-54D1CC256C11-74102-0001DFF3943D4C5E-FFA</guid>
            <pubDate>Wed, 29 Apr 2009 17:16:03 +0100</pubDate>
        </item>

        <item>
            <title>UAE load bank hire fleet &amp; ADIPEC update</title>
            <description>A full press release on the up coming ADIPEC exhibition is available on line at ...</description>
            <link>http://www.hillstone.co.uk/dubai_loadbanks_press__release.pdf</link>
            <guid isPermaLink="false">656092F5-6EF0-4BBE-8D38-45FB4A6A4D10-20733-00008AB8C0DE4EF3-FFA</guid>
            <pubDate>Tue, 28 Oct 2008 13:51:57 +0000</pubDate>
        </item>

        <item>
            <title>Updated AC &amp; DC hire load bank fleet</title>
            <description><![CDATA[<b><font color="#009900">AC &amp; DC rental load banks</font></b><br>
<br>
During 2008 the Hillstone hire fleet has been further increased with an expanded range of DC &amp; 3 phase AC load banks.<p><br>
28th September:  Updated load bank inventory now contains 300KW 3 phase load banks </p><p>25th August: Hillstone are able to supply load banks under long term <b>contract hire agreements</b>.  With 6, 12, 24 months rentals offering low cost solutions to providing load banks.<br><br>


22nd August: Updated load bank inventory now contains 4 x 200KW 3 phase load banks, 240V AC 7KW load bank<br>
<br>

13th July: Available on line for downloading are equipment operating manuals and the latest hire agreement<br>
<br>

10th June: ***NEW***<b><font color="#009900">DC load banks </font></b>HLB120-240-78, 120V 600A, 240V 300A

</p>]]></description>
            <link>http://www.hillstone.co.uk/hire/index.html</link>
            <guid isPermaLink="false">DB220794-2884-442E-92BB-3D1FC24ADC77-32212-00056D7529DE2365-FFA</guid>
            <pubDate>Sun, 28 Sep 2008 10:41:22 +0100</pubDate>
        </item>

        <item>
            <title>Hillstone mobile web site to your phone</title>
            <description>We have released a compact  mobile phone load bank web site which will provide a quick and easy way to surf Hillstone information whilst on the go.&lt;br /&gt;
&lt;br /&gt;
Add www.loadbank.mobi to your phone bookmarks</description>
            <link>http://www.loadbank.mobi</link>
            <guid isPermaLink="false">875AD161-1867-4383-9DB2-29963890B782-8578-00003A2F492F6431-FFA</guid>
            <pubDate>Sun, 28 Sep 2008 10:35:45 +0100</pubDate>
        </item>

        <item>
            <title>ADIPEC exhibition Abu Dhabi 3rd Nov to 6th Nov</title>
            <description>Hillstone will exhibit in conjunction with our Middle East partner Gulf Incon International at the prestious Oil &amp; Gas exhibition in Abu Dhabi between the 3rd Nov to 6th Nov.&lt;P&gt;We will display AC &amp; DC load banks from our product range, and look forward to assisting your load bank requirements.</description>
            <link>http://bit.ly/b5m66e</link>
            <guid isPermaLink="false">8CC7E80A-F5BA-4C78-901E-7D3452C69BAC-8578-00003A34ACD134A1-FFA</guid>
            <pubDate>Sun, 31 Oct 2010 10:30:28 +0000</pubDate>
        </item>

        <item>
            <title>Updated stock load banks available for immediate despatch</title>
            <description><![CDATA[<b><font color="#009900">DC load banks</font></b><br>


<a href="http://www.loadbanks.co.uk/hbn24-30-tss2.pdf" target="blank">HBN30-200</a><br>
qty 2 off, packed price £1286
<br>

<a href="http://www.loadbanks.co.uk/hbn110-130-tss2.pdf" target="_blank">HBN130-300</a> <br />
qty 1 off, packed price £2967<br />
<br />


<div><div>These load banks can be shipped to any worldwide destination, please email your local airport to our <a href="mailto:loadbanks@mac.com">sales </a>department</div></div>
</div><br />
*************************************************************<br />
<u>Typical production timescales are being reduced</u> <br />
		HBN load banks at 3 to 4 weeks<br />
*************************************************************
]]></description>
            <link>http://www.loadbanks.co.uk/dc.htm</link>
            <guid isPermaLink="false">4C481504-4A23-433C-94DB-A1F26A8E3B66-32212-000572543538428E-FFA</guid>
            <pubDate>Wed, 10 Sep 2008 23:42:42 +0100</pubDate>
        </item>

        <item>
            <title>Credit Card payment options for Load Banks</title>
            <description>Hillstone can now accept MasterCard and Visa payments along with other debit cards for payment of load banks, hire equipment and battery monitoring systems&lt;br /&gt;</description>
            <link>http://www.hillstone.co.uk</link>
            <guid isPermaLink="false">78EE1BB3-BDF0-4BF9-A421-6377D9A7AF2F-11754-0000D3799A8A37B8-FFA</guid>
            <pubDate>Sat, 19 Aug 2006 09:13:41 +0100</pubDate>
        </item>

        <item>
            <title>DC Load banks with serial PC control</title>
            <description>The latest interfacing options with our load banks now includes PC serial interfacing from applications such as LABVIEW. &lt;br /&gt;
&lt;br /&gt;
The load bank are controlled with an internal CANbus and via a serial convertor voltage and current readings along side LABVIEW controls can now be offered on any available load bank</description>
            <link>http://www.loadbanks.co.uk</link>
            <guid isPermaLink="false">manual:1177969653374:7427070251919685:www.hillstone.co.uk/Macintosh%20HD/Users/paulsmethurst/Documents/Hillstone/Web%20site/hillstone.rss</guid>
            <pubDate>Mon, 03 Mar 2008 16:10:22 +0000</pubDate>
            <content:encoded><![CDATA[The latest interfacing options with our load banks now includes PC serial interfacing from applications such as LABVIEW.  The load bank are controlled with an internal CANbus and via a serial convertor voltage and current readings along side LABVIEW controls can now be offered on any available load bank]]></content:encoded>
        </item>

        <item>
            <title>Varicon HAV130-13 load bank data sheet is now available for downloading</title>
            <description>Available for downloading from the Hillstone web site are the latest data sheets for the fully automatic constant power and constant current battery discharge Varicon load banks. &lt;br /&gt;

 HAV130-13 is rated form 6 to 130V, to a maximum power of 13kW.&lt;br /&gt;

 Constant current discharge testing ratings of: 75A 110V, 130A 50V, 260A 24V, 130A 12V, 67A 6V&lt;br /&gt;
</description>
            <link>http://www.loadbanks.co.uk/hav13013tds3.pdf</link>
            <guid isPermaLink="false">56352515-905C-44AF-BEEE-BF6F7567601B-12745-0000E1C840CA6B9F-FFA</guid>
            <pubDate>Mon, 03 Mar 2008 22:35:58 +0000</pubDate>
        </item>

        <item>
            <title>New Varicon HAV520-28 load bank data sheet is now available for downloading</title>
            <description>Available for downloading from the Hillstone web site are the latest data sheets for the fully automatic constant power and constant current battery discharge Varicon load banks. &lt;br /&gt;
&lt;br /&gt;
 HAV520-28 is rated form 24V to 540V, to a maximum power of 28kW.&lt;br /&gt;

 Constant current discharge testing ratings of: 35A 500V, 35A 240V, 35A 110V, 65A 50V, 65A 24V</description>
            <link>http://www.loadbanks.co.uk/hav52028tds5.pdf</link>
            <guid isPermaLink="false">11026F0D-A50E-41A8-B33C-84C59D8FE41F-11754-0000D34CDC3821F9-FFA</guid>
            <pubDate>Mon, 03 Mar 2008 16:56:38 +0000</pubDate>
        </item>

        <item>
            <title>Independent Power &amp; Energy Europe Exhibition - NEC Birmingham UK - 22, 23, 24 April 2008</title>
            <description><![CDATA[Hillstone will once again exhibit at the Independent Power & Energy Europe Exhibition.  <br />
<br />
The stand will display our latest product ranges including: <br />
<br /><br />
Our latest 100kW load bank - <B>HAC415-100</b><br />
<br />
Low cost naturally cooled HBN load banks<br />
<br />
Live demonstrations our new AC load bank hand held controller with parallel load bank operation.<br />
<br />
<br />The exhibition will be held at NEC Birmingham UK - 22, 23, 24 April 2008 and we look forward to seeing all visitors on our stand C-8
]]></description>
            <link>http://www.ipee.co.uk/</link>
            <guid isPermaLink="false">32FD797F-42E5-44E4-B0EE-48E8E9CC690B-8847-00009A04AA69B1D0-FFA</guid>
            <pubDate>Mon, 03 Mar 2008 15:48:11 +0000</pubDate>
        </item>

    </channel>
</rss>

